23 July 2019

In search of a seamless relationship between Operational Management, Risk Management and Internal Audit.

I continue to be amazed by the too frequent disconnect between Internal Audit, Risk Management, and Operational Management. The artificial, though regulator sanctified, “second line” and “third line” functions are too often used to justify two (complementary) functions seeking complete independence from each other, independence that can undermine the effective identification and management of risks.

Operational Management (OM) is responsible for delivering the objectives of the organisation, and specifically the objectives of their function(s). Risk Management (RM) provides support to OM by providing the framework for identifying and helping OM determine and implement the most appropriate management strategies to cover the risks to the accomplishment of the objectives. Internal Audit (IA), by focusing limited resources on the areas of highest risk, confirms that key controls are in place and that they are functioning effectively to ensure that risks to the achievement of objectives are managed within the risk appetite of the business.

Within that previous paragraph, there are a number of important words and concepts, too frequently considered separately, when they should be viewed as part of a seamless set of processes and responsibilities. Sadly too often the three are not seen as part of that seamless delivery, with the second two being detached from OM and from each other.

Operational Management is responsible for delivery of results, and as such is provided with resources (budget) that are almost always limited in relation to the provision of any “extras”. Managers face annual budget challenges, and not infrequently are asked to make “savings”. Sometimes this can (sacrilege) include reducing headcount or increasing the level of output expected without increasing resources. Frequently it is the control environment that suffers when this happens. 

Risk Management can help OM to identify and consider the risks that they face, and can assist OM in identifying the controls that would be needed to manage the risks to the level acceptable within the business’s risk appetite. It remains, however, OM’s responsibility to implement the controls and to ensure the controls are functioning. RM can, and should, provide ongoing monitoring at an observation level of the risks and controls across the business.

(There is, of course, also the critical role that RM plays in the identification and mitigation of Emerging Risks and External Risks, but for our purposes here, we are looking only at the internal relationships and management of risks.)

RM confirms with OM that the control environment is functioning, as confirmed by OM and reviewed selectively by RM. The assessment of the current status of any risk is the responsibility of OM who own the risk and who is responsible for managing the risk. RM can suggest alternative views on the effectiveness of the management or the risks, both to OM and to senior management and the Board, but ultimately OM is responsible for the risks and controls. Furthermore, OM is responsible for determining how the provided resources will be applied for the achievement of objectives.

In this the assessment of the effectiveness of the control environment if firstly the responsibility of OM, and unless there is a fundamental disagreement with RM, it is OM's prerogative as to how resources should be applied. This includes the development and implementation of controls. While RM (and IA) can recommend, as it is OM that ultimately carries the responsibility, it is OM's decision. Escalation is appropriate only when there is a fundamental disagreement between RM (and IA) and OM.

Of course, it is appropriate that the Board be provided with additional comfort that the control environment is effective. Sadly the conflicting priorities of OM can lead to misreporting or inaccurate reporting of the effectiveness of the control environment. Likewise, limited RM resources can provide a general level of comfort that risks are identified, and that controls appropriate to the risk appetite have been implemented. 

This means that, while RM can and does support the implementation and operation of a framework for identifying and managing risks, it may be outside RM's resources to perform "deep-dives" into all areas of risk.

I am reminded of a bank that told their regulator that they treated all customers as "high risk" customers for due diligence purposed. The regulator's response was that if all customers were "high risk", then no customers were, and the real "high risk" customers would slip past the due diligence process. The bank was required to segment its customers and implement a higher level of due diligence than they had been performing.

IA’s role is to fill the gaps and to provide additional assurance that key controls in high-risk areas are functioning as per asserted by OM and that such controls are functioning with the risk appetite. So, IA’s role is the provision a “deep-dive” assessments of high-risk areas, to ensure that the key risks have been identified, that appropriate responses have been considered and agreed, and that controls have been put in place that brings management of the risks within risk appetite.

To summarise then:

  1. OM is responsible for delivering business objectives,
  2. OM applies limited resources to accomplish this,
  3. RM assists OM in identifying and assessing risks to the accomplishment of objectives,
  4. OM provides RM (and others) with regular reporting to confirm that objectives will be achieved within the acceptable risk appetite,
  5. RM confirms that risk across the enterprise is being managed within risk appetite, as reported by OM and as reviewed by RM,
  6. IA provides detailed “deep dive” assessments of the effectiveness of controls in the highest risk areas of the business, or where there may be limited confidence that risks are being managed within risk appetite,
  7. OM, RM and IA jointly provide assurance to the Board that there can be a reasonable expectation that business objectives will be accomplished with risk appetite.


A quick word about risk appetite: the risk appetite of the enterprise is set by the Board (with the assistance of senior management and RM) and it is the responsibility of OM to deliver objectives within that risk appetite. 

This means that RM should continuously confirm that OM understands the risk appetite as it applies to their areas and objectives, and should confirm that there is an effective control environment commensurate with the level of risk and the enterprise’s risk appetite. OM does not set the risk appetite; neither does RM or IA.

Being practical, this influences the reporting to the Board on risk and the effectiveness of the system of internal controls. Some practical suggestions that come from this:


  1. All IA findings should include discussion of the risks that have been identified,
  2. There is an IA finding only if the control environment is failing (or is expected to fail) to manage identified risks within risk appetite,
  3. All actions agreed by OM should be reflected against the risks as recorded and managed through the risk register,
  4. All IA findings and actions should be recorded against their associated risks, or new risks should be added to the risk register where there is no corresponding risk,
  5. OM and RM then need to update their review processes to ensure that the identified risk and mitigation is actually functioning.
  6. Where IA has requested confirmation of the implementation of new or updated controls, this should be provided.
  7. Annual review and approval of the updated risk appetite should then drive a review by OM and RM of the risk and control environment and will inform the IA review cycle by potentially changing the perceived highest risk areas.


These steps will lead to a more seamless integration of OM, RM and IA, and will improve both relationships at the operational level, and provider greater confidence to the Board that the control environment if well established, operating and being effectively monitored. 

20 September 2018

A Selection of Risk Management and Internal Audit Posts

Over the past year, I have posted a number of articles relating to Risk Management and/or Internal Audit. the objective of these has been to focus on the practical yet strategic, and not on individual risks or reporting standards. A selection of those articles includes:


  1. Strategic Audit or Strategic Auditing, and horror story
  2. Risk Geography and Waterfalls
  3. Delegations of Risk Authority
  4. Inherent and Residual Risk is Inadequate; What is the Appetite?
  5. What about your Target Risk?
  6. Single Points of Failure (SPOFs)
  7. Risk Quantification and Physics Envy
  8. Three Lines of Assurance
  9. Beyond Three Lines of Defence; Risk Management and Internal Audit
  10. After 22 years, InfoSec remains important
  11. The Importance of Emergency Lighting; a cautionary tale


Strategic Audit or Strategic Auditing. The ability to perform audits or strategy, or to perform strategic audits it a critical element of successful Internal Audit. The willingness and ability to report the findings and recommendations requires courage; something too often lacking. I provide a specific example, that I believe contributed to the fall of a very major financial services company.

In Risk Geography and Waterfalls I discuss a simple methodology to add to your suite of risk identification and assessment tools, and how the use of Waterfall diagrams can reduce the likelihood of missing important risks. We've used this to some success, and the direct linkage of risk identification to the critical income and expenses waterfall improves coverage. Bringing the right people to the table is facilitated by this methodology, further improving risk identification and assessment.

Delegations of Risk Authority: Too often we hear people say "We've accepted that risk" when what they really mean is "this is too hard; either I'm not able to explain it adequately, or I know remediation costs won't be approved, so I'm not going to try". Just as companies have Delegation of Financial Authority, so should there be a Delegation of Risk Authority. This article discusses this in more depth, and suggests are way forward.

Inherent and Residual Risk is Inadequate: What is the Appetite? Too often the practice of internal auditing, when performing risk assessments, looks at Inherent Risk (the level of risk before any remediation) and Residual Risk (the level of risk after remediation. This is inadequate and forgets one of the most important aspects of Risk: the Risk Appetite. Without understanding the agreed Risk Appetite, Internal Audit risks imposing its assumptions of what the Risk Appetite should be, not what Senior Management and the Board have agreed.

What about your Target Risk? following on from assessing the Inherent and Residual risk levels, if you do not know what your target risk level is, you will not know if your controls are effective, you will not know if the investment in remediation is appropriate, and most of all, you will not know when you have reached a level of control that meets the Risk Appetite of Senior Management and the Board.

Single Points of Failure:  While not a Risk Management or Internal Audit issue specifically, SPOFs (Single Points of Failure) are probably what will take the company down, at least for a short time. Yet these are also the area where you will probably see the most examples of "we've accepted that risk" from people with no authority to accept such risks.

Risk Quantification and Physics Envy: There is no question that the quantification of the potential negative (and positive) impact of the actualisation of a risk can help to clarify thinking, and support activities required to manage the risk. Yet quantification can also be a waste of time, and can be used to create rubbish results that mask as science. Poor quantification and simulation are easily as bad as or worse than poor subjective assessments.

Thr
ee Lines of Defence: The preferred model of various financial regulator and that has been embraced by the Insititute of Internal Audit, provides a sound framework, as long as we recognise that all lines of defence provide assurance. These two articles address the importance of Assurance from all three lines, and the linkage between Risk Management and Internal Audit.

Three Lines of Assurance:  It is time for a fundamental shift in the thinking about the concept of Three Lines of Defence and the value that Internal Audit and Risk Management deliver, and an equally fundamental shift in the role of management in the delivery of assurance and value creation. Over the past decade, the role of provider of assurance to the Board has been defined by the Internal Audit profession, and enshrined in the IIA's presentation of the Three Lines of Defence (TLD) model. That presentation of the TLD model and the associated assumption of who provides assurance undermines the responsibility of professionals across businesses, and presents an overt statement that management is not to be trusted. As such, it is time to review that model and introduce new thinking.

Beyond the Three Lines; Risk Management and Internal Audit: This article is focused on the relationship between two elements of the Three Lines; Risk Management (in theory 2nd line) and Internal Audit (the 3rd line). These two lines of defence provide Directors, the Board, shareholders and stakeholders with confidence that the system of internal controls is functioning effectively, that risks are being identified and managed, and where appropriate, accepted or assumed deliberately.

Meanwhile, some stories never get old, and those tend to be around the practical, head-shaking events that we remember, but that could well manifest themselves again.

22 years later, and InfoSec remains a problem. In fact, it is probably a much bigger problem. How to convince the IT Manager that he really needs to take security seriously? Sometimes it takes a practical lesson.

The importance of Emergency Lighting. Have you ever been in a situation where you were simply bumbstruck by the lack of thought that went into a potentially life threatening situation?


01 July 2018

Risk Acceptance - the need for a Delegation of Risk Authority (DRA)

Over too many years, when pointing out a risk or situation, either management of below may respond with "it's okay, we've accepted that risk".

Really? Who accepted that risk, and did they have the authority to accept that much risk on behalf of the business. In too many cases the risk identified was significant, and if presented to senior management or the Board, that risk would not have been "accepted", at least not without consideration of the implications and costs of remediation or reduction of the risk.

What actually happened is that the person or people dealing with the risk have been unable to quantify or otherwise clarify the risk and potential impact, or develop a costed and realistic plan to mitigate the risk. Because of this, they have failed to convince themselves of the severity of the risk, and therefore are unable to communicate that exposure to senior management. Having failed to effectively communicate, they fall back on "we've accepted that risk". 

Too often what was missing was an actual assessment of the risk, either subjective or quantitative where possible. Included in such as assessment should be a definition of the existing controls and an assessment of the effectiveness of those controls.

Controls exist to provide confidence that risks are being managed. As such, on a quarterly, six-monthly and for some annual basis, management owners of controls should confirm that the controls associated with risks are functioning and are effective. Evidence should then be provided that demonstrates that the controls are functioning. 

Rarely is there a formal confirmation that the person responsible for the control actually has the authority to accept the associated risk.

Risk acceptance can be split into two parts:

  1. First, is the Risk Appetite appropriate for this risk? It may well be that the entities Risk Appetite is too caution for this type of risk, and therefore the reduction of the risk to tolerable levels will be too expensive and result in a situation of "over-control". 
  2. The second factor is the authority of the person accepting the risk. While companies generally have Delegations of Financial Authority (DFAs), rarely is there a formal Delegation of Risk Authority (DRA). 

To put that into a concrete example, a manager may have a financial delegation of up to $/€/£10,000. That is the level of expenditure that has been determined to be appropriate for that level or individual, without the need for additional authority. The next level up may have a delegation of $/€/£50,000. Finally, for major decisions, a Director or Board authority might be required, say for investment or programmes with a value above $/€/£1,000,000.

But how much Risk can a manager accept? 

What is missing from the picture is the Delegated Risk Authority to accept a residual risk position. All risks have an inherent level of risk and potential impact. We implement controls to reduce or manage the risks resulting in our residual or "net" risk position. Yet our residual risk position may not represent a level of risk that is acceptable to the entity within the bounds of the entity's Risk Appetite. 

Where the residual risk is above the acceptable level, either additional controls or mitigation needs to be put in place, or the residual level of risk needs to be "accepted" (which logically would alter the Risk Appetite for that particular risk). 

The question is; who has the authority to accept that residual level of risk?

My recommendation is that companies put in place a Delegation of Risk Acceptance (DRA) that mirrors their Risk Assessment levels. As most companies use, for better or worse, a Likelihood x Impact grid, that provides us with an example for the Delegation of Risk Acceptance.

When a ‘risk’ is accepted, this indicated that there is agreement that no additional actions or controls will be put in place to further reduce either the impact or the likelihood of the risk.

If, for example, the entity may have assessed the risk of a System Failure as a "High Likelihood / High Impact" pre-remediation of any kind. Controls in the form of effective governance over IT systems may have brought the assessed residual level of risk down the "Medium/Medium". However, the Risk Appetite may have been stated by the Board to be "Medium (Likelihood)/ Low (Impact)".

In this case, there is a disconnect between the residual risk position and the Risk Appetite, and either the residual risk must be "accepted" or additional control must be put in place.

The "solution" is the Delegations of Risk Acceptance.

For each risk (as per the Risk Appetite and/or grid) there should be an identified level of authority to accept a residual risk position. For example, a residual risk level of High/High should only be "accepted" by the Board, while a Low/Low residual risk position may be "accepted" by a manager.

In this case, the DRA may state that residual risk positions that are "Medium" (in likelihood or impact) require acceptance at the Cxx level. In which case, for this example, the CIO should be required to "accept" the residual "Medium / Medium" position, based on an assessment of the cost and effort to bring the residual risk to the Risk Appetite level of "Medium / Low".

The key to the Delegation of Risk Acceptance is that it is linked to the difference between the actual residual risk scoring and the Risk Appetite. Where there is no difference, and the residual risks score equals the Risk Appetite, there is no need to "accept" the risk.

Has this been implemented?

Yes, though with mixed success. As with all issues of Risk Management, the quality of Board, Director and Senior Management buy-in is critical. Communication is required, and an understanding of the risk and control environment, both internal and external.

When used effectively, the DRA can ensure that risk acceptance is being taken at the right levels, or additional investment is authorised to bring the residual risk situation into line with the Risk Appetite. I have seen this accomplished, and the risk environment has been demonstrably improved.

Likewise this provides Internal Audit with an effective tool to communicate and encourage the implementation of effective controls. On the one hand, IA "empowers" the auditee to perform their risk assessment and to then gain the required investment or reallocation of resources to resolve the audit issue, or management with sufficient DRA is then able to confirm that the risk as identified by IA has been accepted at an appropriate level.


04 October 2016

Risk and Internal Audit - beyond Three Lines of Defense



1 Introduction

The Three Lines of Defence model (TLD, 3LoD, etc) is a model that sets out to (i) provide a framework for the provision of assurance within a company, (ii) provide regulators with a model they can recommend companies implement, and (iii) that they can assess when reviewing regulated companies. It is the simplicity of the model and the risk of the introduction of silo mentalities that seems to draw much concern from the Risk Management profession. Yet it is also the simplicity of the model that enables companies to implement it.

This article is focused on the relationship between two elements of the Three Lines; Risk Management (in theory 2nd line) and Internal Audit (the 3rd line). These two lines of defence provide Directors, the Board, shareholders and stakeholders with confidence that the system of internal controls is functioning effectively, that risks are being identified and managed, and where appropriate, accepted or assumed deliberately.

As a reminder, operational management is considered the 1st line of defence, in that it is operational management that runs the business, including the internal controls that manage risk and opportunity in the business.

However, a more accurate and measured interpretation of the TLD model shows all three lines (Operational Management; Risk Management (and Compliance); and Internal Audit) all provide elements of assurance, with each supporting the other two to ensure that the assurance provided can be relied upon. Where any of the three lines fail to perform their specific responsibilities, the overall level of assurance that can be provided is reduced, regardless of the quality of the other two lines.

We call it the TLD, but a more appropriate model may be the Three Elements of Assurance, which doesn't sound nearly as interesting.

2 Three Lines of Defence

The first thing to remember about the Three Lines of Defence (TLD) model is that it is not a model for a complete Governance structure. It is a model for the management of risk and provision of assurance and comfort to the Executive, Board and shareholders (and appropriate stakeholders). As such, the TLD fits within an overall set of governance functions and structures, and has the specific purpose of ensuring appropriate focus on, and management of risks and controls.

The three lines are generally considered to be Operational Management (1st line), Risk Management and Compliance (2nd line) and Internal Audit (3rd line). Without operational management, the company, any company, would not accomplish its basic functions, and therefore may assume unacceptable risks when providing services and products to customers. Operational management, through operating the business in line with the objectives and constraints of the Board, provides the returns to the shareholders, within the regulatory and legal constraints on the business. Operational Management also ensures controls function effectively and efficiently, and demonstrates that processes are functioning in a manner consistent with achievement of objectives.

The implementation and operation of the TLD is not "the" governance system, but is an element within an overall governance framework. Some organisations explicitly limit the number of functions considered part of "2nd line" to Risk Management and Compliance, while others include a range of operational support functions such as HR, Finance, IT, etc. Personally I consider these functions to be part of "first line" as they are operational functions supporting the direct activities of the enterprise.

The Bank of International Settlements (BIS), in their 2012 guidance on Internal Audit (http://www.bis.org/publ/bcbs223.pdf), includes Risk Management, Compliance, Legal, HR, Finance, Operations and Technology in the 2nd line. Equally, the IIA (Institute of Internal Auditors) not surprisingly included a wide range of business activities in the 2nd line, while reserving the third line for Internal Audit only.

The BIS, in their 2015 guidance on Corporate Governance (http://www.bis.org/bcbs/publ/d328.pdf), has a slightly updated discussion of the TLD model:

"The increased focus on risk and the supporting governance framework includes identifying the responsibilities of different parts of the organisation for addressing and managing risk. Often referred to as the “three lines of defence”, each of the three lines has an important role to play. The business line – the first line of defence – has “ownership” of risk, whereby it acknowledges and manages the risk that it incurs in conducting its activities.  The  risk  management  function  is  responsible  for  further  identifying, measuring,  monitoring  and  reporting  risk  on  an  enterprise-wide  basis  as  part of  the  second  line  of  defence,  independently  from  the  first  line  of  defence.  The  compliance  function  is  also  deemed  part  of the  2nd line  of  defence.  The  internal  audit  function  is  charged  with  the  3rd line  of  defence, conducting risk-based and general audits and reviews to provide assurance to the board that the overall governance  framework,   including  the  risk  governance  framework,   is  effective  and  that  policies  and processes are in place and consistently applied."

This latest BIS guidance is clear in setting out the three lines. Like any model, if inflexibly adhered to, TLD can oversimplify and result in silos, in which there is an assumption that only IA is able to provide assurance to the Board and Audit Committee; this in a time when regulators and professional associations are increasingly calling for separate Risk Committees or, failing that, a joint Audit and Risk Committee. In the evolving models and expectations of regulators, Risk Management has a critical role in providing assurance at the Board level.

In summary, the TLD model provides an effective mechanism for the allocation of responsibility for the operation of controls, the assessment of the overall risk and control environment, and allocation of responsibility for the detailed review of specific high risk areas of the control environment. While there is a risk of silos reducing the ability of the first and second to provide assurance, the model is "simple" enough to allow for easy communication and allocation of responsibilities and ownership of operation and assurance over the system of internal controls. Regular communication of the concept also ensures that operational management is aware of and able to enunciate the TLD principles.

Regulators and professional bodies agree; Internal Audit and Risk Management need to be separate, and only in exceptional cases, or where the business is too small to afford both, should they be combined. In cases where they are combined, additional oversight by the Board is important. Both functions are and need to be independent of management, yet as highlighted above, they fulfil very different aspects of provision of assurance.

3 Should Risk be pan-enterprise

There is an old adage: Risk Managers do not manage risk, Risk Managers create the environment that enables the identification, assessment, management and reporting on risks across the enterprise. One of the key elements of that statement is "across the enterprise". Risk Management must, like Internal Audit, have free and unrestricted access across the enterprise in order to form and maintain a consolidated picture of the risk environment, and to ensure that management is aware of their responsibilities for implementation and operation of that control environment. (Of course Risk Management has many other responsibilities, and I recommend you dig deeper into the BIS governance guidance document).

Yet here the difference between RM and IA comes to the fore; RM works with management to identify, assess, respond and monitor the risk environment. RM does not perform deep-dive reviews of individual controls or events (unless specifically requested or if part of the management of a specific transactions and activities, in which case RM, for these activities, becomes an element of operational management).

The identification and recording / assessment of risks then assumes the identification of controls associated with that risk. Of course, there may be no controls in place to manage the risk, in which case there should be a record of the gap in the system of controls, and the control gaps should be documented, with responsibility allocated for implementing controls, based on and in agreement with the own or the associated risk.

Controls do not exist in a void. Without a business objective and risks to the achievement of that objective, there is no need for a control. Such "controls" are actually a drag on the effective and efficient performance of business operations to achieve objectives. Therefore, if there is a control, then there is a risk, and the risk only exists in relation to the ability of the business to achieve objectives.

Logically then, identification of a risk universe begins with the objectives of the business or function being controlled, at whatever level of granularity, and from those objectives, risks to the achievement of the objective can be identified. Of course, people will identify risks without a specific linkage in mind. It is part of the role of Risk Management to assist in the assessment of the risk, including how that risk may impact of achievement of objectives.

The role of Risk Management in relation to individual controls and the control environment is to ensure that management performs periodic assessments of the effectiveness of the controls they are responsible for, and provides attestation that the controls are functioning effectively. Where the controls are not functioning, or there are gaps in the system of controls, management must identify these missing controls, and through the Risk Management process, confirm the status of implementing such controls.

Risk Management challenges management's assertions on the effectiveness of the controls over risks. Management operates the controls, and attests to the effectiveness of the controls. Internal Audit tests management’s assertions at a detailed level.

4 The Scope of Internal Audit

To be effective, Internal Audit must have unrestricted access across the enterprise, yet should work to a risk-based programme of internal audits and reviews. There is a natural tension between the desire to provide Internal Audit coverage across all business processes, systems and departments, and the recognition that Internal Audit is a cost overhead that must be carefully applied. The nature of Internal Audit activity is to confirm through investigation that the stated control environment is in place, and that controls are functioning to the level of effectiveness attested by management. This means that Internal Audit by nature must dig deeper in to the strategic and operational functioning of the specific areas subject to individual audits.

This can be expensive, and therefore IA resources need to be carefully targeted and used to best effect. Equally, as the audience for Internal Audit's reports and ultimately for the level of assurance provided is the Board and Audit Committee, Internal Audit activity should be focused only on those areas (process, system or department) whose controls or the failure of the controls may have a material impact on the ability of the business to achieve strategic objectives.

What this means in practice is that Internal Audit must be cognisant of, and monitor risk and control status across the enterprise, but that actual Internal Audit activity should be focused on areas of greatest risk. In addition, specialist resources to perform internal audits of technical areas are expensive to retain on staff, and therefore tend to be brought in for the specific audit.

In summary this means that where Internal Audit is performing a controls based audit (as opposed to an E&E, Strategic or Operational audit), they tend to perform deep yet narrow reviews of higher risk areas. Where controls have previously been identified and management has attested to the effectiveness of the functioning of the controls, Internal Audit can use the Risk Register and associated controls reporting to inform audit planning and performance.

5 The Relationship between Internal Audit and Risk Management planning

The objective of IA planning is to ensure that the highest risk areas within the enterprise and within any individual auditable area are covered by audit review and testing. To accomplish this, frequently IA will review the Risk Register for the area(s) that will be reviewed. The Risk Register should inform audit planning, but should not be the primary resource.

This means that IA needs to interact with Risk Management and the Risk Register three times in the audit cycle: (i) at development of the IA Strategic and Annual Plan, (ii) at the planning stage of each audit, and (iii) post audit confirming that the auditee has updated the Risk Register to reflect findings (risks) and control recommendations. The following chart provides an overview of the IA planning processes, and the key interactions with Risk and the Risk Register.
 

In planning an audit, Internal Audit needs to consider the range of business processes, systems and departments that are included in the specific review. These should be risk assessed and ranked, with the primary focus of audit testing and review being focused on the higher risk areas. At this point it is important to note that risk assessment is not only "likelihood & impact" but extend well beyond, to include factors such as sensitivity of data, value at risk or exposure, as well as other factors.

Note the continual use of the word "risk" in planning and execution of the audit. The question could be asked, why aren't all the risks that IA will be considering already included in the Risk Register? The simple answer is that audit planning is considering a far more granular level of risks at the detailed business process level, while the Risk Register may have a risk or risks that encompass a wider range of detailed business processes within a single risk.

Certainly the major controls should be included in the Risk Register and be associated with individual risks. Again, a Risk to a business objective may have a number of Controls in place to manage that Risk within the Risk Appetite of the enterprise, as set by the Board. Yet the development and evolution of the specific Risk within the Risk Register may omit or fail to include all controls applicable to the Risk. In such a case, if IA places too much reliance on the Risk Register, there is the danger that the full control environment will not be understood, and that key processes and controls will be missed or discounted. This could undermine the value of the audit, and open the results to dispute by not taking into account compensating or other existing controls.


6 IA findings in a Risk world

There should be a link between IA findings and recommendations, and the overall risk environment of the enterprise, and therefore Risk Management. Working backwards, there cannot be an IA recommendation if there is not an associated risk. The failure of a control to function, or a lack of evidence of the functioning of the control does not in itself mean that there is a risk. It could simply mean that the control is redundant, or the evidence previously provided or assumed to be required is not adequate to demonstrate that the control is effective or even required. It can be difficult for an enterprise to get the right balance of under-controlled (and thereby exposed to greater risk than is the Risk Appetite of the enterprise) or over-controlled (and thereby incurring excessive costs of control for limited economic benefit through reduced exposure).

Therefore, when auditing internal controls, generally IA findings should not exist if there is no associated risk. This means that the structure and content of the IA finding needs to clearly enunciate the risk or risks associated with that finding, and the potential impact if the required or recommended controls are not functioning, or not put in place. It is also critical that the auditee recognises and agrees with the description of the description and the resulting situation of risk. Without this agreement, there can be no agreement to the required controls. Failure to gain buy-in to the underlying enunciation of the situation and the risk undermines IA, the auditor, and can result in unnecessary conflict between IA and business units.

Having buy-in to the description of the situation and associated risk(s) does not automatically presuppose that the IA recommendation is the most appropriate response to the risk(s) highlighted by the auditor. Management understands, or should understand, their business objectives and constraints. Therefore management should in theory be best positioned to confirm what controls will be most effective, and to agree to apply the resources required to implement an effective control. IA can and should use best judgement to consider if management's response is appropriate, and if so should be willing to alter the recommendations to meet what management suggests.

The recommendation that is almost always missing from audit reports is one that should be common to all Audits; that the risks, controls and remediation actions identified in the audit should be cross referenced to the Risk Register and the Risk Register updated to reflect the findings of the audit. Where the Risk and Controls are included in the Risk Register, these should be updated based on the audit findings. Where the Risk does not exist, it should be added. Where the Control is not included against a Risk, it should be added.

By taking this final step, IA ensures that the overall risk environment and system of internal controls is updated to reflect the actual current situation.

7 Linkages, and a model

Through the Risk Management and Internal Audit processes, we can build a consolidated picture of the risk environment and system of internal controls. Assurance is provided to Senior Management, the Board, shareholders and key stakeholders. Risk Management ensure a holistic view of the risk and control environment, while Internal Audit provides comfort, through detailed testing, that management's assertions of the effectiveness of the control environment are accurate, and provides guidance on where remediation activity is required.

The TLD model, if narrowly applied as per the IIA's interpretation, assumes all assurance is provided by Internal Audit. This is a narrow view that does not adequately consider the assurance roles that are provided by 2nd and 1st lines in their daily activities.

A more accurate and measured interpretation of the TLD model shows all three lines (Operational Management, Risk Management (and Compliance), Internal Audit) providing assurance, with each supporting the other two to ensure that the assurance provided can be relied upon. Where any of the three lines fail to perform their specific responsibilities, the overall level of assurance that can be provided is reduced, regardless of the quality of the other two lines.

Management's responsibility is to operate controls that exist to manage identified and recorded risks, efficiently and effectively. Risk Management's responsibility is to ensure that risks are identified and assessed, that the risk environment and system of internal controls is defined, that risks and their associated controls are recorded and monitored, and that management provides attestation or assertions on the effectiveness of those controls. Internal Audit provides a ‘final line of defence’ by performing detailed reviews to confirm the effective functioning of control. None is responsible for catching the others out, or "owning" the provision of assurance.

Internal Audit cannot be everywhere or see the entire risk environment - internal and external. Risk Management cannot retain a systemic view of risk if it engages in detailed controls testing, and managers can provide assurance only over those controls for which they are individually responsibility for ensuring are functioning.

We call it the TLD even through a more appropriate model may be the Three Elements of Assurance, but that doesn't sound nearly as interesting.